East Stand Twickenham Rugby Stadium
Project Particulars
- Detailed coordinated design of M & E services is 3D
- Full public health install of 17no bar areas
- Full public health install of 18 WC areas
- Full public health install of 13 commercial Kitchen areas
- Ventilation systems for commercial Kitchens
- Ventilation systems for WC areas
- Full ductwork distribution systems for Levels 1, 2, 2A, 3, 4 and 4a
- New LTHW and CHW pipework distribution ranging from 100mm to 15mm
- Install of 4-pipe fan coil system for heating and cooling of circa 210no fan coils
- Full extension to existing BMS controls
- Dynamic chemical flushing of pipework via use of multiple pump systems
- Full commission of all new mechanical services across all floors
Duration:
33 weeks
Value:
£5,000,000
Area:
118,000 sq. ft
Levels 1-6, Bower Building, Old Street, London
Project Particulars
- New LTHW and CHW pipework distribution across all floors
- Circa 145no new 4-pipe fan coils
- All exposed services
- Full new ventilation ductwork distribution across each floor
- New BMS infrastructure for all FCU’s and touch screen head end
- Perimeter trench heating with new LTHW pipework
- Comms room DX cooling for 24/7 operation
- Dynamic chemical flushing of pipework via use of multiple pump systems
- Full commission of all new mechanical services across all floors
Duration:
11 weeks
Value:
£2,400,000
Area:
65,000 sq. ft
Levels 1-4, Waterloo Station General Offices, London
Project Particulars
- Supply and install 5no new roof mounted AHU’s
- 4no new WC ventilation systems with roof mounted twin fans
- 300no new internal ducted VRF units with corresponding roof mounted condensers
- Full public heath infrastructure for new WC’s cores
- New booster sets and water conditioners in plant room
- New close controlled downflow N+1 cooling of 200kW for comms room
- Gas detection systems
- New BMS system and head end controlling all plant and on floor distribution
- Full commission of all new mechanical services across all floors
Duration:
23 weeks
Value:
£2,800,000
Area:
75,000 sq. ft
Levels 4 & 5, 114 Whitechapel high Street, London
Project Particulars
- Design and build for CAT B alterations to existing CAT A infrastructure across both floors
- Relocation of 21no existing 4-pipe fan coils
- Extensive LTHW and CHW alterations
- New supplementary VRF systems for all meeting rooms
- New roof mounted AHU to provide additional required fresh air
- 120no cross talk attenuators to maintain acoustic treated air path
- Teapoint public health installation for 4no teapoint areas
- New 24/7 cooling for comms rooms
- Modifications to existing BMS system
- Chemical flushing of pipework
- Full re-commission of systems
Duration:
16 weeks
Value:
£890,000
Area:
48,000 sq. ft
Levels 24 & 25, The Shard, London
Project Particulars
- Design and build for CAT B alterations to existing CAT A infrastructure across both floors
- Relocation of 18no existing 4-pipe fan coils
- Extensive LTHW and CHW alterations
- Ventilation adaptions with new CO2 sensors and motorized dampers to divert air to high occupancy areas when in use.
- Teapoint public health installation for 5no teapoint areas
- New 24/7 cooling for comms rooms
- Modifications to existing BMS system
- Chemical flushing of pipework
- Full re-commission of systems
Duration:
14 weeks
Value:
£260,000
Area:
43,000 sq. ft